Meet the filling requirements for water, juice, tea, carbonated drinks, functional beverages, etc., and achieve different requirements for low temperature, room temperature, medium temperature, or hot filling based on process characteristics
| Product/Filling Method | Beverage filling | |||||||
|---|---|---|---|---|---|---|---|---|
| Bottled water | Carbonated beverages | Hot beverages | Ultra-clean cold chain | Ultra-clean at ambient temperature | Ultra-clean aseptic temperature | Sterile | ||
| Mechanical | Mechanical valve | ★ | ★ | ★ | ★ | ★ | ★ | |
| Electronic | Liquid level detection valve | ★ | ||||||
| Flow meter valve | ★ | ★ | ★ | ★ | ★ | ★ | ★ | |
| Weighing valve | ★ | ★ | ★ | ★ | ★ | |||
| Servo piston valve | ★ | ★ | ||||||
| Peristaltic pump valve | ★ | ★ | ||||||
| Applicable Products | Mineral water Purified water Other drinking water |
Coke Sprite Salt soda Carbonated soda water "Carbonated mixed beverages, etc." |
Juice Tea beverage Milk tea Coffee Mixed milk beverage Functional beverages, etc. |
Fresh milk Fresh fruit juice Vegetable juice Yogurt, etc. |
Ozone-free mineral water Soda water "Carbonated mixed beverages, etc." |
Juice Tea beverage Mixed milk beverage Functional beverages, etc. |
Juice Tea beverage Milk tea Coffee Milk Mixed milk beverage Functional beverages, etc. |
|
| Production capacity | 6000-48000bottles/hour | 8000-36000bottles/hour | ||||||
| Key points for resolution | Solve the problems of microbial control, filling leakage, material foaming, material viscosity, and particle mixing | |||||||
| Production line equipment | Blow molding (destacking/bottle sorting), empty bottle conveying, bottle rinsing, filling, capping, bottle body coding, full bottle conveying, visual inspection, labeling (shrink labeling), packing (wrap packing/film packing), case conveying, case coding, palletizing, film wrapping, etc | |||||||
Conduct preliminary project evaluation based on customer production goals, product characteristics, functional requirements, and delivery timeframes
Analyze and design technical parameters for engineering projects, including process, mechanical, and electrical control design, etc.
Develop and oversee the project manufacturing schedule until the project passes the performance test and acceptance inspection
Develop and oversee the project manufacturing schedule until the project passes the performance test and acceptance inspection
Improve the technical proficiency of production and maintenance personnel, and provide training in equipment operation and maintenance skills
Help improve efficiency and reduce costs through standardized, differentiated, and value-added services
Simple operation, intelligent collaboration with upstream and downstream devices, creating an intelligent factory





